A one-glance guide for integrators, consultants, and AV/IT managers: what will slow approvals, reshape tenders, and change your lifecycle plan in 2026.
Use this as a visual index to the article: five forces, five “do next” moves you can apply in your next room standard, tender response, or refresh plan. Built to screenshot cleanly.
In 2026, you win faster approvals when you sell certainty: documented controls, managed security, inclusive design, proven interoperability, and predictable running cost.
Drop it into your bid pack as a “why these clauses exist” slide. It saves time with IT, procurement, and stakeholders who do not live in standards meetings.
For internal planning, assign each force to a named owner: someone who can answer the questions in two minutes, not two days.
Room standards: Use each tile as a sign-off check (controls, security, access, interop, running cost).
Tender responses: Lift the “Do next” lines into your compliance narrative to justify the clauses.
Refresh planning: Map each tile to an owner (IT, security, UX/access, AV engineering, facilities/energy) before scope sign-off.
AI features arrive via updates and cloud services. Clients will ask what runs where, what gets stored, and who can switch features off.
Do next: Add a one-page “AI facts” note to your room pack (data flow, defaults, off switch).
Networked AV is treated like any other endpoint. If you cannot show patching, access control, and a clean inventory, you lose time or lose the job.
Do next: Ship a security baseline with every design (segmentation, logins, updates, remote access rules).
Sell certainty, not promises.
If you can document this in two minutes, approvals speed up and support risk drops.
Buyers want systems that survive refresh cycles and multi-site rollouts. “Works in a demo” is not enough; they want acceptance tests and monitoring.
Do next: Build repeatable reference designs and test multi-vendor paths before you promise them.
Running cost is now part of the pitch: power draw, heat, uptime, support effort, and end-of-support risk. Clients compare total cost, not only capex.
Do next: Include a running-cost snapshot (power band + support plan) in your proposal pack.
Access needs show up in venues and meeting rooms alike. Captions, hearing support, and readable controls move from “nice” to expected in more tenders.
Do next: Add an accessibility check at design stage (captions, hearing support, UI readability, wayfinding).